Categories

Contact Us

Head Office: 5-10 Block B, NO 39, 158 Alley Huancheng West Road Southern Part Haishu District Ningbo China.
Fitting Factory Add: 329 National High Way Side, Zhangqi Town, Cixi, Ningbo, China.
Vaves Factory Add: Shamen Industrial Area, Yuhuan, Taizhou, Zhejiang, China.

Brass Spring Vertical Check Valve

Item No.: W-7001
Raw matrial: DZR, CW617, CZ132, C37700, CW614N, Hpb 57-3, Hpb 59-1
Forged brass body
Surface Treatment: Brass colour (Sand Blasting). Nickle Plated, Chrome Plated.

Quick Details

Item No.: W-7001

Product name: dn 25 thread water globe brass vertical spring loaded water pump check valve

Raw matrial: DZR, CW617, CZ132, C37700, CW614N, Hpb 57-3, Hpb 59-1

Forged brass body

Surface Treatment: Brass colour (Sand Blasting). Nickle Plated, Chrome Plated.

Normal Pressure: PN16, PN20, PN25, PN32, PN40

Size: From 1/2″-4″

Keywords: pump check valve, vertical spring loaded check valve, thread brass vertical spring check valve, water pump check valve, check valve dn 25

Package: Standard export packaging, Colourful export packaging

Product Display

Customers Feedback

Customers Feedback

Brass Valves & Fitting Production Process

Brass valves & Fitting Production Process

Our Factory

factory

About this item

  • Product Size:3/4″ Thread Female
  • This valve is used to prevent the back flow of fluids
  • Maximum pressure rating 200 psi,200 WOG (water, Oil, gas)
  • This valve has a brass body with a stainless steel spring for long-lasting durability
  • Brass for corrosion resistance, ductility at high temperatures, and low magnetic permeability
  • Lead-free brass construction
  • 1-1/4″ Threaded openings
  • Poppet style with stainless steel spring

Our Customer & Certification

FAQ

1. How to get free samples?

A: Please send your address, tel. number, post code and express account number to our mail box, plus the model No. you need with QTY, we will contact you to arrange it.

2. How long is the delivery time?

A: 3 to 5 working days for samples, 15 to 20 days for plastic pipes and fittings. 30 to 40 days for brass fittings after receiving deposit.

3. What is your packing?

A: In general, we use normal exportation package with transparent film bags and cartons. It can be as your requirement.

4. How is the warranty of the products quality control?

A: We hold the tight end quality controlling from very beginning to the end and aim at 99.99% error free.

5. What’s the delivery time?

A: We usually ship by DHL, FedEx and TNT. It usually takes 3-5 days to arrive. Airline and sea are shipping both available. For products in stock, we can ship it within 7 days after receiving your payment. For custom order, within 24 tons, production time is 20-35 days after confirmed every details.

Send Inquiry

request a quote